Spec-Thermal Archive

Spec-Thermal Technical documents for the SPEC-THERMAL INSULATED MASONRY SYSTEM provided by CBIS/Korfil.

Spec-Thermal Files

301 HR Data Sheet

Modification Date 01-24-12

303 HR Completed Projects

Modification Date 02-23-12

Correctional Facility Project List

Modification Date 02-23-12

Flexural Considerations For 8-in HI-R Masonry Walls

Modification Date 02-23-12

HI-R Block R-Value Bion Howard Report

Modification Date 02-23-12

Hi-R Drawing Details

Modification Date 02-23-12

Hi-R Evaluation Report

Modification Date 02-23-12

HI-R GROUTED AREAS WITH INSERTS

Modification Date 02-23-12

HI-R Grouted Reinforced Masonry Cross Sectional Areas

Modification Date 02-23-12

HI-R Insert Dimension Sheet

Modification Date 02-23-12

HI-R SPECIFIER PERFORMANCE SPEC-2008

Modification Date 02-23-12

NCMA Structural Engineering Report

Modification Date 02-23-12

Potossi Missouri Correctional Facility

Modification Date 02-23-12

R-Value Certification Letter

Modification Date 02-23-12

State Of Massachusetts HI-R_Letter

Modification Date 02-23-12

[12  >>